Calculate the total costs of producing the budgeted amount of Roadster motorcycles based on the existing method of attributing overheads.
【参考答案及解析】
Existing method Roadster $ Direct labour ($5 per hr) (W1) 1,100,000 Materials (W2) 960,000 Overheads (at $24) (W3) 5,280,000 Total costs 7,340,000
Existing method Roadster $ Direct labour ($5 per hr) (W1) 1,100,000 Materials (W2) 960,000 Overheads (at $24) (W3) 5,280,000 Total costs 7,340,000